Inputs

Your current default is 2ร—. Adjust live to test pricing scenarios โ€” "what if I went to 2.2ร— for stamped?"
Extra for access issues, permits outside the norm, decorative scoring, lighting conduit, etc.
๐Ÿ”’ Your Sub's Rates (LOCKED โ€” what you PAY)
Base fixed cost$400
Unit cost$300 per 91 sqft
Brushed material$5.20/sqft
Exposed aggregate material$7.80/sqft
Stamped material$10.40/sqft
Removal surcharge$5/sqft
What you pay your sub. AI is forbidden from changing these unless you explicitly say so.
๐Ÿ’ฐ Your Quote Rates (sub ร— 2)
Brushed$10.40/sqft
Exposed aggregate$15.60/sqft
Stamped$20.80/sqft
Removal surcharge$10/sqft
Base (mobilization)$800
Unit cost$600 per 91 sqft
Adjust the multiplier above (default 2ร—) to run "what if I charged 2.2ร—?" scenarios without touching sub rates.
๐Ÿงฑ Add-on Rates (EDITABLE โ€” your cost)
Fiber mesh ($/sqft)
Wire mesh, sheets on chairs ($/sqft)
#3 rebar @ 18" grid ($/sqft)
#4 rebar @ 12" grid ($/sqft)
Concrete, per extra inch ($/sqft/in)
Gravel base, per extra inch ($/sqft/in)
These are NOT the locked sub sheet โ€” they're cost estimates you can edit. Reinforcement = market install cost (confirm what your sub actually charges and set it here). Per-inch rates come from your own $200/yd concrete (incl. +10% over-order) and $100/yd gravel (incl. compaction pad).

Result

Sub cost (what you pay)$0
Retail price (what they pay)$0
Your profit$0
Line itemSubร—Retail
Base / mobilization$0$0
Unit cost (logistics)$0$0
Material (finish)$0$0
Removal / tear-out$0$0
Reinforcement$0$0
Thicker slab (>4")$0$0
Thicker base (>4")$0$0
Add-ons (pass-through)$0โ€”$0
TOTAL$0$0
Each line has its own multiplier โ€” the top "Retail multiplier" input resets all four. Sub column never changes (locked rates).
Margin: 0% ยท Profit/sqft: $0

๐Ÿ“‹ Client quote โ€” copy & paste into a text

Sandler tip: if you ever quote this on-site, do the summary close first โ€” stack value, state price last. Never open with "$8,400."